Dear experts,
I have a doubt/question regarding the upgrade strategies of NetWeaver 7.0.
There is now EHP3 for NetWeaver 7.0, which says SAP Application Server
ABAP 7.31. There is also NetWeaver 7.31. The Basis version is the same,
but when checking the ST06 transaction, in EHP3 it looks the old way (like
in 7.0) and in NW 7.31 it has the new design.
Both SAP_BASIS components have the same level, though the transactions
look different.
Also In MOPZ I see options for upgrade to 7.31 and for EHP 3. Which one
should be preferred ? EHP or upgrade and why are there differences ??
Thank you!!