Hello everyone,
I'm planning an EHP6 for SAP ERP 6.0. In the whole landscape there is also NW BW 7.0 and PI 7.0 solutions.
I was checking SAP Note 1043047 that state the following:
"For PI, it is a prerequisite that no other system in the system landscape has a higher release than the PI system”
Do I need to perform PI Upgrade first? I was checking with UDA tool and there's no problem about it (only with EHP7)
I was also checking SAP Note 1388258 that state:
" Application driven software updates:
- Updating or upgrading the application system to SAP Business Suite 7 (e.g. ERP 6.0 Enhancement Package 4 or CRM 7.0) or higher (up to Suite7i2011) does not require to implement an SAP NetWeaver EhP for your central SAP NetWeaver system, if this system has at least release SAP NetWeaver 7.0 SPS 19.
- This rule applies to SAP NetWeaver Portal, SAP NetWeaver Business Warehouse and SAP NetWeaver PI in combination with SAP Business Suite 7, SAP Business Suite 7i2010, and SAP Business Suite 7i2011 with the known limitations as listed in section 3."
There is also an attachment (Adjusted Version Interoperability.pdf) in the same SAP note. So, does this mean that PI have to be at least in release 7.0 SP19?
Has anyone tried this scenario?, is there any consideration?
Regards,
JAM