Dear Experts,
We have met the serious performance issue during month-end closing. It takes more than 48 hours to run CON2 and 30 hour to run CO88. However, there is no any performance issue at the daily system operation. Our basis engineer collects the system information as below:
SAP component version: EHP4 FOR SAP ERP 6.0 / NW7.01
Operation system: AIX
Database: DB6
DB version: 09.01.0009
We have only one server for our production system. This server plays both roles as database server and application server.
During month-end closing, the status of system as following:
CPU User% Kern% Wait% Idle%
ALL 9.7 0.7 10.9 78.6
Network KBPS I-Pack O-Pack KB-In KB-Out
Total 1379.7 1954.1 1723.8 690.3 689.3
Disk Busy% KBPS TPS KB-Read KB-Write
Total 100% 16.5K 1015.0 16.5K 12.0
FileSystem KBPS TPS KB-Read KB-Write
Total 16.5K 1.1K 16.5K 12.0
SAP Memory Curr.Use % CurUse[KB] MaxUse[KB] In Mem[KB]
Roll area 10.02 26,261 29,720 131,072
Page area 1.75 28,028 1,599,992 1,120,000
Extended mem 0.72 1,921,024 8,384,512 268,435,456
Heap mem 0 0 2,779,384
Our basis engineer also collect top 5 tables as following. The total size of database is 686,260,352.
Table name Size
COSS 123,019,562
COEP 59,508,832
RESB 6,593,504
MSEG 4,800,640
AFRU 3,621,568
Can anybody tell me what we can do to improve our month-end closing performance? No matter which kind of solutions. Thanks in advance.