Hello Colleagues,
I have 740 PI system(ABAP+JAVA) currently at SPS01. We need to upgrade it to SPS02.
I upgraded the ABAP part from SPS01 to SPS02 by disabling java part(Making it as pure ABAP system), created xml for ABAP part and upgraded the same with SUM successfully.
Now i activated the java part and now i want to upgrade Java stack also to SPS02.
Is is possible to upgrade Java stack only in Dual Stack(ABAP+JAVA) system separately when ABAP stack is already upgraded??? I have generated xml for java stack but that stack is not working.
As this is 740 system so JSPM is obsolete. Please do not suggest about JSPM.
Is is possible in SUM to upgrade dual stack system as from 740 system there is no concept of Dual Stack(Dual stack split tool is there)? And also please suggest now what should i do as i already upgraded ABAP stack.
Regards,
Surojit